Struck capacity shows the contents of the bucket when it is filled to what level?

  1. 1.5

  2. 2

  3. 3

  4. 4

The correct answer is: 1.5

Struck capacity refers to the volume of material that a bucket can carry when it is filled to a specified level, which is typically just level with the top edge of the bucket. In this case, the value of 1.5 signifies that when the bucket is filled to that level, it represents the maximum effective capacity for loose materials, without any heaping or overfilling. This measurement is crucial in construction and excavation because it provides a standard way to quantify how much material can be effectively transported in one load, ensuring accurate planning and resource management. Understanding struck capacity is important for contractors and builders because it helps them determine how many loads they will need to move a specific quantity of material, thus influencing efficiency and cost considerations. The other values offered in the choices might refer to different concepts not specific to the struck capacity in the context used here.